Fulton UK

3 x Fulton 60J Gas-Fired Skid Mounted System

Once just a steam boiler manufacturer, Fulton now specialises in ready-to-ship skid mounted and fully packaged boiler plant rooms to meet the current demand for off-site fabrication. The company puts great emphasis in providing sales and application advice and a full commissioning and after sales service to a growing customer base in hospital and healthcare facilities, food and beverage processing, laundries and other applications.

Fulton’s steam and hot water solutions can be delivered as fully prefabricated plant rooms or complete skid-mounted units, built to fit a prepared location and connect direct to your services. Systems are built in Britain to BS2790 1992 Class 1 and are available for electric, gas, oil and dual-fuel firing, with duties from 14 kg/h to 4787 kg/h F&A 100ºC.

Using the latest CAD equipment our design team can accommodate the most sophisticated engineering specifications in surprisingly compact spaces, locating components in the best possible position to suit the installation.

All systems are designed to be delivered to site and installed on a prepared concrete base and final installation is made easier by connecting to termination points, pre-installed by the customer, to ensure that the new boiler plant matches existing site services. Single or multiple skid-mounted systems based on Fulton’s boilers are available complete with all necessary ancillary plant including boiler blowdown separator, feed water and condensate return tank, water treatment and control system with interconnecting mechanical and electrical services.

These systems are especially beneficial for projects where on-site work is difficult or limited by time, where access is remote or restricted, or where security is an important consideration. 

Potential Applications

  • Prisons & High Security Facilities
  • Research Establishments
  • Food Processing Plants
  • Hospitals
  • Educational Institutions
  • Military Bases & City Centre Developments